• This Week's Best Deals | SHOP HOT BUYS
  • Cool Off in the Water - Select Swimming Pools 20% Off | SHOP NOW
Menu
  • This Week's Best Deals | SHOP HOT BUYS
  • Cool Off in the Water - Select Swimming Pools 20% Off | SHOP NOW

44 in Rectangular Impact Backboard w/ Rim

  • bvseo_sdk, java_sdk, bvseo-4.0.0
  • CLOUD, getAggregateRating, 91ms
  • REVIEWS, PRODUCT
  • bvseo-msg: The resource to the URL or file is currently unavailable.;
Product #: 0000000034068
| SKU: 007750706
$64.95
Lifetime 44 in Rectangular Impact Backboard w/ Rim
Lifetime 44 in Rectangular Impact Backboard w/ Rim
Select Store to see item availability
Add To Cart
  • Model # 3823
  • Ideal for replacing an existing board or roof mount
  • High-density polyethylene backboard
  • 18 in solid steel rim
  • 0.5 in steel braces
  • Fade-resistant graphics
  • Includes all-weather nylon net
  • Assembly required (mounting brackets sold separately)
  • Item measures 44 in L
  • 5-year limited manufacturer's warranty
  • Weight: Approximately: 22.7 pounds
  • Shipping Dimensions: Approximately 5 x 2 x .25 inches.
  • bvseo_sdk, java_sdk, bvseo-4.0.0
  • CLOUD, getReviews, 27ms
  • REVIEWS, PRODUCT
  • bvseo-msg: The resource to the URL or file is currently unavailable.;

Recently Viewed

top
Close Navigation